ABB | 1MRK004810-DC | RED670 Line Differential Protection Relay

The ABB RED670 (1MRK004810-DC) is a high-performance Relion 670 series IED (Intelligent Electronic Device) designed for phase-segregated line differential protection of overhead lines and cable systems. It provides fast, selective protection for multi-terminal overhead lines, transformer-feeders, and multi-breaker arrangements, ensuring grid stability with advanced communication capabilities over optical networks.

Engineered for full digital substation integration, the RED670 features high-speed current differential algorithms, integrated distance backup protection, synchrocheck, and extensive disturbance monitoring. Its modular rack-mounted design supports multiple communication protocols, including IEC 61850 Edition 1 and 2, for reliable integration into power automation networks.

ABB RED670 LINE DIFFERENTIAL PROTECTION RELAY 1MRK004810-DC Image 1 of 4

Parameter Specification Value / Feature Details
Brand ABB
Model RED670 (Ordering Code: 1MRK004810-DC)
Series Relion 670 Series
Product Name Line Differential Protection Relay
Country of Origin Sweden
Product Status Active / In Stock
Dimensions (H x W x D) 265.9 mm x 448.7 mm x 229 mm (1/1 x 19″ 6U Case)
Weight 12.0 kg (26.4 lbs)
Auxiliary Power Supply 110–250 V DC / 100–240 V AC
Rated Frequency / CT Inputs 50/60 Hz / 1 A and 5 A (Software Selectable)

✔ Unpacking & Visual Check: Inspect the 6U relay casing, front Human-Machine Interface (HMI) display, optical communication ports, and rear terminal blocks for mechanical damage sustained during transport.

✔ CT/VT Loop Verification: Ensure Current Transformer (CT) secondary loops are properly short-circuited at test blocks and Voltage Transformer (VT) lines are safely isolated before connecting rear terminals.

✔ Auxiliary Voltage Test: Measure incoming auxiliary DC/AC supply rails to confirm stability within the rated 110–250 V DC / 100–240 V AC range before powering on.

✔ Protective Grounding: Connect a dedicated low-impedance copper earthing strap from the rear earth terminal of the relay enclosure directly to the substation panel grounding bar.

✔ Fiber-Optic Differential Link: Check inter-relay fiber-optic communication channels for clean optical connectors, proper attenuation levels, and correct transceiver alignment.

◆ Front HMI Cleaning: Periodically wipe the liquid crystal display and keypad using a soft, clean micro-fiber cloth; do not use harsh chemical solvents or abrasive pads.

◆ Terminal Tightness Inspection: Inspect and re-torque rear terminal block screws (CT/VT feeds, binary inputs, output trip contacts) during routine maintenance to prevent loose-wire faults.

◆ Optical Port Protection: Keep protective dust covers fitted over all unused fiber-optic transceiver ports to prevent dust contamination on internal optics.

◆ Data & Configuration Backups: Regularly back up protection parameter maps, disturbance files, and event logs using ABB PCM600 (Protection and Control IED Manager) software.

⚠ Relay Inoperative / Ready LED Inactive

Check auxiliary input voltage and inspect external panel supply fuses. Verify rear power module terminal wiring polarity and connection tightness.

⚠ Differential Communication Link Alarm

Inspect fiber-optic patch cables for tight bend radiuses or physical surface damage. Clean optical connectors and measure transceiver power levels.

⚠ CT Supervision / AC Current Unbalance Warning

Inspect CT secondary wiring loops for open circuits or high resistance. Confirm phase sequence and CT ratio parameters in the PCM600 configuration file.

⚠ De-energize Before Handling: Ensure high-voltage primary circuits, auxiliary power lines, and CT/VT measurement loops are safely isolated before touching rear wiring terminals.

⚠ Never Open Active CT Secondary Circuits: Opening an energized Current Transformer secondary loop produces dangerously high impulse voltages; always short-circuit CT terminals prior to disconnection.

⚠ Electrostatic Discharge (ESD) Protection: Handle internal modules or communication cards only while wearing a grounded anti-static wrist strap.

⚠ Authorized Settings Access: Protection threshold parameters and trip matrix logic should only be adjusted by authorized protection and control engineers.

? Q: What is the primary protection function of the ABB RED670 relay?

A: It provides high-speed, phase-segregated line differential protection combined with distance backup protection for multi-terminal transmission lines and cable circuits.

? Q: What software tool is used to configure and commission the RED670?

A: System configuration, parameter mapping, GOOSE messaging setup, and disturbance analysis are managed via ABB PCM600 (Protection and Control IED Manager).

? Q: Does the RED670 support IEC 61850 digital substation standards?

A: Yes, it fully supports IEC 61850 Edition 1 and Edition 2 protocol standards, including station bus (MMS), process bus (Sampled Values), and GOOSE messaging.

? Q: Can the RED670 protect lines with transformers within the protected zone?

A: Yes, it features integrated in-rush current restraint and phase-shift compensation algorithms to protect line-transformer unit combinations effectively.

Share this story: