Product code: N/A
GE IS200TPROH1B Mark VI Protection Board
¥66,666.00 Original price was: ¥66,666.00.¥1,450.00Current price is: ¥1,450.00.
Product images and prices are not for reference. Please contact me for a quote!
🌍Country of origin: USA France Germany Estonia Norway UK
⌚Delivery date: in stock
🛠After-sales service: brand new with one year warranty
⚙️ Product Category: Module/Controller/Server/Motor/Touch Screen
🕰Warranty: 12 months/365 days
☎️ Please contact me: 15359029662 Ms. Amy Sun
📎Chinese official website: www.dcsplcabb.com
📩Email: geabbamy@gmail.com
💬Whatsapp: +86 15359029662
Detailed content
-
-
-
Model: IS200TPROH1B
-
Brand: General Electric (GE)
-
Series: Mark VI Turbine Control System
-
Core Function: Provides a dedicated electrical interface within the turbine control architecture
-
Product Type: Printed Circuit Board (PCB) / Control Interface Board
-
Key Specs: IS200 hardware platform, TPRO functional designation, Revision B
-
Supply Status: Available – subject to physical stock confirmation
-
Stock: Available upon confirmation
-
Warranty: Confirm with supplier before ordering
-
Ship From: China
Identification note: The supplied part number identifies the board as IS200TPROH1B. Confirm its exact functional designation, connector assignments, and associated assembly against the GE nameplate and Mark VI documentation before installation.
Part 3: Key Technical Specifications
-
Manufacturer: General Electric (GE)
-
Model Number: IS200TPROH1B
-
Functional Designation: TPRO
-
Product Description: Emergency Protection Terminal Board
-
Product Series: Speedtronic Mark VI
-
Board Type: Turbine Protection Signal Termination Board
-
Speed Pickup Inputs: 9 passive magnetic speed pickup inputs
-
Thermocouple Inputs: 9 channels
-
Generator Voltage Input: 1 single-phase potential transformer input, nominal 115 V AC
-
Bus Voltage Input: 1 single-phase potential transformer input, nominal 115 V AC
-
Analog Inputs: 3 channels; one configurable for 4–20 mA, ±5 V DC, or ±10 V DC, and two for 4–20 mA
-
Sensor Supply: 28 V DC supplied by the VPRO protection system
-
Speed Signal Range: 2 Hz to 20 kHz
-
Speed Pickup Cable Length: Up to 300 m with specified shielded-pair cable
-
Potential Transformer Cable Length: Up to 100 m using 18 AWG shielded twisted-pair cable
-
Synchronization Voltage Range: 75–130 V RMS
-
Voltage Measurement Accuracy: 0.5% of rated voltage
-
Frequency Accuracy: 0.05%
-
Phase Measurement Accuracy: Better than 1 degree
-
Internal Protection Architecture: Interfaces with triple-redundant VPRO protection boards
-
Terminal Configuration: Two removable barrier-type terminal blocks
-
Internal Connections: JX1/JY1/JZ1 and JX5/JY5/JZ5 connections to protection channels
-
Configuration Jumpers: JP1A and JP1B for analog input channel 1 selection
-
Board Dimensions: Approximately 178 × 330.2 mm
-
Installation: GE Mark VI turbine protection cabinet
Technical specifications are based on the GEH-6421M Mark VI Turbine Control System Guide, Volume II.
xm-dcs.com+1
Part 4: Application Scenarios & Pain Points
Engineering Challenges
In a gas turbine protection system, a speed-control signal and an independent emergency overspeed signal serve different purposes. If the primary turbine controller experiences a fault, the independent protection system must still receive reliable speed, temperature, and synchronization signals.
The TPRO board provides these inputs to the VPRO protection processors. It is an important part of the turbine’s emergency overspeed and shutdown architecture, not an ordinary PLC input card.
One point worth emphasizing: replacing this board requires more than matching terminal positions. The VPRO hardware identification, analog input jumpers, thermocouple wiring, and trip-system configuration must all agree with the original engineering drawings.
Typical Application Scenarios
1. Gas Turbine Power Generation – Emergency Overspeed Protection
-
Application: Monitoring turbine shaft speed through passive magnetic pickups.
-
Engineering purpose: Supplies speed signals to the independent VPRO protection processors.
-
Integration: Nine speed pickup connections support the protection architecture, including three redundant VPRO channels.
2. Combined-Cycle Power Plants – Turbine Protection
-
Application: Independent monitoring of turbine speed and exhaust temperature.
-
Engineering purpose: Provides backup protection signals if the primary control path develops a fault.
-
Integration: Interfaces with VPRO and associated TREG trip terminal boards.
3. Generator Synchronization – Electrical Protection
-
Application: Monitoring generator and bus voltage before circuit-breaker closing.
-
Engineering purpose: Supplies voltage signals for backup synchronization checking.
-
Integration: Two single-phase potential transformer inputs with nominal 115 V RMS secondary voltage.
4. Industrial Gas Turbines – Exhaust Temperature Protection
-
Application: Thermocouple monitoring for backup exhaust over-temperature protection.
-
Engineering purpose: Supplies nine thermocouple inputs to the independent protection system.
-
Integration: Three thermocouple groups are distributed across the VPRO protection channels.
5. Turbine Retrofit Projects – Existing Mark VI Systems
-
Application: Replacing aging protection terminal boards during scheduled maintenance.
-
Engineering purpose: Maintains the existing turbine protection architecture without redesigning the entire control cabinet.
-
Integration: Requires matching terminal-board identification, connector configuration, and VPRO hardware.
System Integration Architecture
The following simplified signal path illustrates where this board fits into the protection system.
Field Sensors and Electrical Signals
Magnetic pickups · Thermocouples · Generator PT · Bus PT · Analog transmitters
GE IS200TPROH1B
Signal termination and distribution
VPRO-R8
Protection channel R
VPRO-S8
Protection channel S
VPRO-T8
Protection channel T
TREG / Associated Trip Circuit
Relay voting and turbine trip-solenoid control
Conceptual signal architecture, not a cabinet wiring drawing. Actual connections depend on the installed Mark VI configuration.
The TPRO does not directly operate the trip solenoids. The VPRO processors perform the emergency protection logic and control the associated trip circuitry.
xm-dcs.com
Example Engineering Case: Emergency Turbine Protection Maintenance
Illustrative engineering scenario, not a documented customer installation.
Background:
A power generation facility schedules an outage to replace an aging protection terminal board in its GE Mark VI gas turbine cabinet.
Problem:
The maintenance team identifies inconsistent speed pickup diagnostics on one protection channel. Replacing the board without recording the existing wiring and jumper positions could introduce additional signal faults.
Solution:
The integration team follows a controlled replacement procedure:
-
Records the original board number and revision.
-
Photographs both terminal blocks and jumper positions.
-
Checks the nine magnetic pickup connections.
-
Verifies generator and bus potential transformer wiring.
-
Checks the thermocouple input assignments.
-
Compares the replacement board’s identification data.
-
Performs channel-by-channel protection checks using the approved commissioning procedure.
Result:
The team establishes a documented replacement baseline and verifies the protection signal paths before returning the turbine to service.
For a protection board, that final verification is not optional. A successful power-up does not prove that emergency overspeed protection works correctly.
Part 5: Compatible Replacement Models
The TPRO board belongs to a safety-related protection architecture. Similar GE part numbers do not automatically share the same terminal assignments, connector identification, or protection functions.
Replacement Compatibility Assessment
Original Model Alternative Model Compatibility Main Difference Required Action IS200TPROH1B IS200TPROH1B Exact matchSame board designation and revision Verify complete identification IS200TPROH1B IS200TPROH1A UnverifiedDifferent hardware revision Compare GE drawings and system configuration IS200TPROH1B IS200TPROH1C UnverifiedDifferent hardware revision Confirm connector and protection compatibility IS200TPROH1B IS200TPROS1C Not establishedDifferent functional designation Require OEM cross-reference IS200TPROH1B IS200VPROH1B Not compatibleVPRO processor rather than TPRO terminal board Different hardware function Important Replacement Considerations
1. IS200TPROH1A vs. IS200TPROH1B
Both belong to the TPRO protection-board family, but a shared functional designation does not prove direct interchangeability.
Before substitution:
-
Compare complete part numbers and revision markings.
-
Check connector identification.
-
Verify jumper positions.
-
Confirm the associated VPRO configuration.
-
Check the applicable GE installation documentation.
2. IS200TPROH1C
Treat this as a separate revision requiring engineering verification. Do not assume that its connector layout or hardware identification matches the H1B version.
3. Mark VI vs. Mark VIe
This distinction matters. GE’s Mark VI documentation explicitly states that TPRO does not work with Mark VIe I/O packs. Do not confuse a Mark VI protection-board application with a Mark VIe I/O-pack replacement.
xm-dcs.com+1
Engineering Recommendation
My recommendation is straightforward:
-
Original IS200TPROH1B available: prioritize an exact replacement.
-
Original unavailable: request an approved GE cross-reference before considering another revision.
-
Full turbine-control upgrade planned: evaluate the complete protection architecture rather than substituting individual boards.
There is no verified universal drop-in alternative or reliable price premium for the other revisions. A supplier quotation and engineering compatibility assessment are necessary.
Part 6: Troubleshooting Quick Reference
Common Faults and Diagnostic Methods
Fault Symptom Possible Cause Board Relevance Quick Inspection Recommended Action Overspeed protection diagnostic Magnetic pickup signal fault High Check MPU wiring and VPRO diagnostics Inspect pickup circuit and TPRO connections Generator synchronization alarm PT wiring or voltage input fault High Compare generator and bus voltage readings Check PT wiring and input circuits Exhaust over-temperature diagnostic Thermocouple wiring fault High Compare individual TC channel readings Inspect thermocouple polarity and connections Analog input fault Incorrect jumper setting High Inspect JP1A and JP1B positions Match the original approved configuration VPRO communication or channel alarm Cable, connector, or VPRO fault Medium Inspect JX/JY/JZ connections Isolate the affected protection channel Board identification mismatch Incorrect board revision or connector ID High Review hardware identification diagnostics Verify the exact replacement part Intermittent speed signal Damaged shielded cable or loose terminals Medium Check pickup continuity and cable shielding Repair field wiring before replacing the board Five Practical Troubleshooting Procedures
1. Overspeed Protection Signal Fault
High priority – protection functionThis is one of the most important diagnostic areas for the TPRO system.
Check:
-
Identify the affected magnetic pickup channel.
-
Inspect the corresponding terminal connections.
-
Check cable shielding and grounding.
-
Verify sensor resistance and wiring continuity against the pickup specifications.
-
Review the VPRO diagnostic messages.
-
Compare the signal readings across the three protection channels.
Technical reference:
-
Speed pickup frequency range: 2 Hz to 20 kHz.
-
Minimum input sensitivity: 27 mV peak at 2 Hz.
-
Minimum input sensitivity: 450 mV peak at 14 kHz.
-
Maximum specified pickup cable distance: 300 m using appropriate shielded-pair cable.
Do not simulate an overspeed condition on an operating turbine. Use an approved protection-system test procedure.
2. Generator or Bus Synchronization Alarm
Affected function: Backup synchronization protection.
Diagnostic sequence:
-
Measure the generator PT secondary voltage using an appropriately rated instrument.
-
Measure the bus PT secondary voltage.
-
Compare both readings with the nominal 115 V RMS specification.
-
Inspect PT wiring and terminal tightness.
-
Check cable shielding and grounding.
-
Review the VPRO synchronization diagnostics.
Important specifications:
-
Nominal PT secondary voltage: 115 V RMS.
-
Allowable synchronization input range: 75–130 V RMS.
-
Maximum PT cable length: 100 m.
-
Recommended cable: 18 AWG shielded twisted pair.
-
PT isolation barrier: 1,500 V RMS.
Use properly rated test equipment and follow the plant’s electrical safety procedures.
3. Thermocouple Input Fault
A thermocouple fault does not automatically mean the terminal board has failed.
Check the following:
-
Identify which of the nine thermocouple channels reports the fault.
-
Inspect positive and negative connections.
-
Check for broken thermocouple wires.
-
Verify the correct thermocouple type and polarity.
-
Compare readings with an independent temperature reference.
-
Review the individual VPRO channel diagnostics.
If several channels fail simultaneously, inspect shared wiring and connector connections before replacing the board.
4. Analog Input Reading Incorrect
This is where the TPRO configuration jumpers matter.
The first analog input supports:
-
4–20 mA.
-
±5 V DC.
-
±10 V DC.
The two remaining analog inputs support 4–20 mA.
Troubleshooting:
-
Isolate the relevant circuit.
-
Photograph the existing JP1A and JP1B positions.
-
Check the transmitter output type.
-
Compare jumper settings with the GE wiring documentation.
-
Verify the signal at the appropriate terminals.
-
Review VPRO diagnostic values.
Important: Never change JP1A or JP1B settings simply to eliminate an alarm. The input configuration must match the actual field transmitter and approved protection design.
5. VPRO Hardware Identification Mismatch
The TPRO connector identification system stores important hardware information.
The VPRO reads the connector identification data, including:
-
Board serial number.
-
Board type.
-
Hardware revision.
-
Connector location.
If the identification does not match the expected configuration, the system generates a hardware incompatibility fault.
xm-dcs.com
Recommended checks:
-
Verify the complete TPRO part number.
-
Inspect the connector ID device.
-
Check JX, JY, and JZ cable assignments.
-
Compare the installed board revision with the original cabinet documentation.
-
Review the VPRO diagnostic buffer.
Do not bypass hardware identification checks to force a turbine restart.
Quality Inspection and Testing SOP
For a safety-related turbine protection board, inspection must cover both physical condition and functional signal paths.
1. Incoming Inspection
-
Verify the GE part number and revision.
-
Record the serial number and connector identification.
-
Check original packaging and available traceability documents.
-
Inspect PCB surfaces for corrosion, scratches, and previous repairs.
-
Examine terminal blocks, connectors, and jumper areas.
-
Check for component discoloration or signs of overheating.
2. Functional Testing
Use a compatible GE Mark VI protection-system test configuration.
Recommended test equipment and setup:
-
GE-compatible Mark VI protection test rack.
-
Compatible VPRO protection hardware.
-
Approved thermocouple and analog signal simulators.
-
Magnetic pickup signal simulator.
-
Calibrated digital multimeter.
Test sequence:
-
Inspect the board before applying power.
-
Verify connector identification.
-
Check the JP1A and JP1B configuration.
-
Verify magnetic pickup signal paths.
-
Simulate approved thermocouple inputs.
-
Verify analog input channels.
-
Check generator and bus voltage measurement circuits.
-
Record VPRO diagnostic results.
Do not claim a full trip-system functional test based solely on terminal-board bench testing. Actual emergency shutdown verification requires the complete approved protection test procedure.
3. Electrical Parameter Testing
-
Check accessible electrical connections.
-
Verify grounding continuity where applicable.
-
Inspect for shorts and abnormal resistance.
-
Check terminal block condition.
-
Perform insulation or dielectric tests only where GE permits.
Do not apply a 500 V insulation tester directly to populated electronic circuits without an approved isolation and test procedure.
4. Hardware and Configuration Verification
-
Record the complete hardware revision.
-
Verify the connector ID information.
-
Photograph jumper positions.
-
Compare terminal assignments with the original drawings.
-
Record the associated VPRO hardware identification.
-
Maintain the inspection and test records.
5. Final Quality Inspection and Packaging
-
Obtain quality inspector approval.
-
Place the board in an ESD protective bag.
-
Protect removable terminal blocks and connectors.
-
Use protective foam and bubble wrap.
-
Pack in a suitable shipping carton.
-
Attach a QC Passed label with the inspection date.
Available inspection photographs, testing videos, and individual Test Reports can be provided for customer review.
Engineer’s Final Replacement Checklist
Before ordering or installing this board, confirm these details:
One final engineering warning: The TPRO is part of the turbine’s independent emergency protection system. A board can power up normally and still have an incorrect signal path. Never return a turbine to service until the relevant protection channels and trip functions have passed their approved functional tests.
-
-